New plant extension quarry STUDENA, Bulharsko
Mineral 2000 EOOD, Sofia, Bulharsko
Year of realization: 2023
Construction of gravel and sand processing technology – DP Štít
BEST, a.s.
Year of realization: 2023
Reconstruction of the tertiary node of the technological line in the Císařský quarry
COLAS CZ a.s., Praha, závod Lomy, Jihlava
Year of realization: 2023
Reconstruction of the technological line in the Plaňany quarry
EUROVIA Kamenolomy, a.s.
Year of realization: 2023
Overhaul and extension of the belt conveyor at the Znojmo plant
SCHWING Stetter Ostrava s.r.o.
Year of realization: 2022
Replacement of the primary crusher in the Bílý Kámen quarry.
Českomoravský štěrk a.s., Mokrá
Year of realization: 2022
Granulation circuit for railway gravel in the Valšov quarry
Kamenolomy ČR s.r.o.
Year of realization: 2022
Replacement of the final sorter at operation 2, including the addition of steel structures in the Jakubčovice nad Odrou quarry
EUROVIA Kamenolomy, a.s.
Year of realization: 2021
Replacement of the primary crusher and desilter, including the addition of steel structures in the Dolánky quarry
EUROVIA Kamenolomy, a.s., Liberec
Year of realization: 2021
Reconstruction of the technological line in the Olbramovice quarry
Českomoravský štěrk a.s., Mokrá
Year of realization: 2020 - 2021
Project and execution of the new two-stage crushing line for slag and magnesite sinters in the foundry MNÍŠEK POD BRDY
EVRAZ NIKOM a.s., Mníšek pod Brdy
Year of realization: 2015
Weighing, dosing, mixing and transport of porcelain clay into the new dry kiln of the kaoline plant SKALNÁ
Sedlecký kaolin a.s., Božíčany
Year of realization: 2015
Renovation of the movable reversible belt conveyer at the Agglomeration SOUTH, plant OSTRAVA
ArcelorMittal Ostrava a.s., Ostrava
Year of realization: 2015
Project, manufacture and installation of the crane track with block and tackle above the cone crusher of the line in the quarry ALEXANDRA, Germany
Gaul GmbH, Daxweiler, Germany
Year of realization: 2015
Bauxite hopper with material weighing into the line for screening of coke and briquettes in the plant of ČASTOLOVICE
Saint-Gobain Construction Products CZ a.s., division Isover, Prague
Year of realization: 2015
Extension of the lines for recycled material processing with new belt and chain conveyers and technological structures in the plant of JIHLAVA
Kronospan spol.s r.o., Jihlava
Year of realization: 2015
Weighing belt conveyer for the concrete mixing plant NITRA, Slovakia
Schwing-Stetter s.r.o., Ostrava
Year of realization: 2015
Installation, repairs and adjustment of the tarmacadam plant; mixing of polymeric asphalts, pneumatic transport and dosing of polymers from big-bags at tarmacadam plant BRUNTÁL
BMTI ČR spol.s r.o., Brno
Year of realization: 2015
Steel structures of weighing belt conveyers and aggregate storage for concrete mixing plants
MERKO a.s., Ostrava
Year of realization: 2015
Anti noise screen to the cone crusher at the gravel-sound plant UDIČA, Slovakia
Slovenské štrkopiesky s.r.o., Vel´ký Slavkov, Slovakia
Year of realization: 2015
Feeders and steel structures for the tertiary part of the new line in the stone quarry TREBEJOV, Slovakia
Carmeuse Slovakia s.r.o., Slavec, Slovakia
Year of realization: 2015
Belt conveyers fro transport of sawdust in the line SMORGON, Belorussia
SIA Contiplus Riga, Latvia
Year of realization: 2015
Delivery of 4 pc bridge belt conveyers for the limekiln SAGINAW, Alabama, USA
O-N Minerals, Pittsburgh, USA
Year of realization: 2015
Delivery of 10 pc of belt conveyers for the mobile line in the stone quarry PANTELIMON, Rumania
METSO Minerals (Vienna), Austria
Year of realization: 2015
Project, manufacture and delivery of belt conveyers for the limekiln AISEMONT, Belgium
Carmeuse S.A., Seilles, Belgium
Year of realization: 2015
Semi-mobile line for treatment of aggregate stones in the stone quarry RUDINATA, Bulgaria
ISA 2000 EOOD, Sofia, Bulgaria
Year of realization: 2015
Semi-mobile line for treatment of aggregate stones in the stone quarry DELIAN, Bulgaria
ISA 2000 EOOD, Sofia, Bulgaria
Year of realization: 2015
Belt conveyers for transport of aggregates of stones of the tarmacadam plant Amman BUCHAREST, Rumania
VIAROM Construct S.A., Bucharest, Rumania
Year of realization: 2015
Belt conveyers, chutes, feeders and steel constructions for the secondary nodal point of the line in the stone quarry KURTOVO KONÁRE, Bulgaria
Persenk Invest OOD, Plovdiv, Bulgaria
Year of realization: 2015
Upgrading of the node of dumping of gravels of the line at the stone quarry JAKUBČOVICE
EUROVIA Kamenolomy a.s., Liberec
Year of realization: 2015
Relocation and upgrading of the line at the gravel and sand pit GORNA MACHALA, Bulgaria
Patinzhenering EOOD, Plovdiv, Bulgaria
Year of realization: 2015
Delivery of input hopper, steel structures and conveyor belts fort the semi-mobile line at the gravel and sand pit MIERCUREA CIUC, Romania
METSO Minerals (Vienna) Austria
Year of realization: 2015
Upgrading of the secondary node of the technological line at the stone quarry ZBRASLAV
Kámen Zbraslav a.s., Prague
Year of realization: 2016
Upgrading of the dispatch of the line at the stone quarry MAGLOVEC, Slovakia
I-S Lom s.r.o., Maglovec, Slovakia
Year of realization: 2016
Completion, extension and upgrading of the lines for processing of recycled plasticl with new conveyor belts and chain conveyors and technological steel structures, Kronospan JIHLAVA
Kronospan spol.s r.o., Jihlava
Year of realization: 2016
Grates and steel structures of the hoppers for intake of wood chips into the line for the production of particle board CHIRK, Great Britain
Kronomech spol.s r.o., Jihlava
Year of realization: 2016
Conveyor belts and temporary magazines for two semi-mobile lines at the stone quarry PODGORICA, Montenegro
METSO Minerals (Vienna), Austria
Year of realization: 2016
Exchange of the cone crusher at the line of the stone quarry ŽUMBERK
M-Silnice a.s., Pardubice
Year of realization: 2016
Upgrading of the primary node of the line at the stone quarry SLAPY
Českomoravský štěrk, a.s., Mokrá
Year of realization: 2016
Upgrading of the final sorting facility of the line at the stone quarry BÍLÝ KÁMEN
Českomoravský štěrk, a.s., Mokrá
Year of realization: 2016
Substitute filling of carriages with agglomerate material, coke and bauxite at the factory of ArcelorMittal OSTRAVA
ArcelorMittal Ostrava a.s., Ostrava-Kunčice
Year of realization: 2016
Exchange of 3 pc of screeners of the final sorting facility of the line at the stone quarry KOŠŤÁLOV
EUROVIA Kamenolomy a.s., Liberec
Year of realization: 2016
Installation of the facility for reducing the proportion of particles that can be washed away from the fraction 0-4 mm in dry way in the line of the stone quarry CHORNICE
EUROVIA Kamenolomy a.s., Liberec
Year of realization: 2016
Completion of the row storage tank and extension of the dosing conveyor at the concrete mixing plant HORNÝ HRIČOV, Slovakia
Váhostav – SK – Prefa, s.r.o., Horný Hričov, Slovakia
Year of realization: 2016
Construction of a new line at the gravel and sand pit KRUPNIK, Bulgaria
Roster OOD Smolian, Bulgaria
Year of realization: 2016
Repair and upgrading of the technological line at the stone quarry BORY
Colas CZ a.s., Prague, factory Lomy, Jihlava
Year of realization: 2016
Repair and upgrading of the technological line at the stone quarry SVRŽNO
Colas CZ a.s., Prague, factory Lomy, Jihlava
Year of realization: 2016
Repair and upgrading of the technological line at the stone quarry VÍCENICE
Colas CZ a.s., Prague, factory Lomy, Jihlava
Year of realization: 2016
Upgrading of the secondary and tertiary node at the stone quarry OŘECHOV
Kamenolomy ČR s.r.o., Ostrava
Year of realization: 2016
Input hopper, conveyor belts and steel structures for the line at the gravel pit KREPOST, Bulgaria
Bettran AD, Haskovo, Bulgaria
Year of realization: 2016
Input hopper, conveyor belts and steel structures for the line at the gravel pit GORNO PAVLIKENE, Bulgaria
Patstroj EOOD, Lovech, Bulharsko
Year of realization: 2016
Upgrading of the final sorting facility of the line at the stone quarry ČERNÁ SKÁLA
M-Silnice a.s., Pardubice
Year of realization: 2017
Installation of semi-mobile equipment to reduce the proportion of particles in fraction 0-4 mm that can be flushed away by a dry path in BYSTŘEC
Eurovia Kamenolomy a. s., Bystřec
Year of realization: 2017
New technological line for treatment of aggregates of stones in BATOČINA, Serbia
Metso Minerals ( Wien ), Rakousko
Year of realization: 2017
Repair, reconstruction and modernization of a technological line in the stone quarry TASOVICE
COLAS CZ a. s., Praha, závod Lomy Jihlava
Year of realization: 2017
Repair, reconstruction and modernization of a technological line in the stone quarry VÍCENICE
COLAS CZ a. s., Praha, závod Lomy Jihlava
Year of realization: 2017
Belt conveyors and steel structures for a new production line for processing of wood chips and production of OSB boards in UFA, Russia
SIA Contiplus Riga, Lotyšsko
Year of realization: 2017
Production of a hopper and steel structures for new technological line in MAYDAN, Ukraine
Sandvik Mining & Construction, France
Year of realization: 2017
Reconstruction of belt haulage in a part of line in the stone quarry MASTY
M-Silnice, a. s., Pardubice
Year of realization: 2017
Repair, reconstruction and modernization of a technological line in the stone quarry SVRŽNO
COLAS CZ a. s., Praha, závod Lomy Jihlava
Year of realization: 2017
Replacement of part of belt conveyance of coke and briquettes in ČASTOLOVICE plant
Saint-Gobain Construction Products CZ a. s., divize Isover, Praha
Year of realization: 2017
Grates and steel structures of the 2nd stage, CHIRK, Great Britain
Kronomech, spol. s r. o., Jihlava
Year of realization: 2017
Production of steel structures for screeners of the line, KELLVE, SWEDEN
Sandvik Mining & Construction, France
Year of realization: 2017
Replacement of the primary crusher in the stone quarry DEŠTNÁ
Kamenolomy ČR, s. r. o., Ostrava
Year of realization: 2017
Supplement, extension and modernization of recycling lines by adding new belt and chain conveyors and technological constructions, plus repair of production lines in the facility of Kronospan company in JIHLAVA
Kronospan ČR, spol. s r. o., Jihlava
Year of realization: 2017
New technology line for treatment of aggregates of stones and reconstruction of existing line in KURTOVO KONARE, Bulgaria
Persenk Invest OOD, Bulharsko
Year of realization: 2017
Reconstruction of a line in sorting plant in the stone quarry MAGLOVEC, Slovakia
IS-Lom s. r. o., Maglovec, Slovensko
Year of realization: 2017
Landfilling at the AISEMONT limestone quarry, Belgium
Carmeuse S.A., Seilles, Belgie
Year of realization: 2018
Reverse conveyor belt for the agglomeration transport, OSTRAVA
ArcelorMittal Ostrava a.s., Ostrava – Kunčice
Year of realization: 2018
Construction of a new primary node of the crushing line at the BÍLČICE quarry
Kamenolomy ČR, s.r.o., Ostrava
Year of realization: 2018
Reconstruction of the technological line to dimension 350 at the JAKUBČOVICE quarry
Eurovia Kamenolomy a.s., Liberec
Year of realization: 2018
Installation of a drainage sorter for the final washed 0-4 mm fraction in the JAKUBČOVICE quarry line
Eurovia Kamenolomy a.s., Liberec
Year of realization: 2018
Returning the 0-4 mm heap fraction back to the technological line at the JAKUBČOVICE quarry
Eurovia Kamenolomy a.s., Liberec
Year of realization: 2018
Belt conveyors and steel structures for the new recycled materials processing line, for production of wood laminate boards – 2nd. stage in JIHLAVA
Kronospan ČR, spol. s r. o., Jihlava
Year of realization: 2018
The new primary node of the technological line for the stone aggregate treatment at KURTOVO KONÁRE, Bulgaria
Persenk Invest OOD, Bulharsko
Year of realization: 2018
Reconstruction of the primary node of the technological line at the MASTY quarry
M-Silnice, a.s., Pardubice
Year of realization: 2018
Reconstruction of the primary node of the technological line at the MIROŠOV quarry
COLAS CZ a.s., Prague, Lomy Jihlava plant
Year of realization: 2018
Reconstruction of the primary node hopper of the technological line at the MORNA quarry, MOŘINA
Českomoravský štěrk a.s., Mokrá
Year of realization: 2018
Reconstruction of the primary node of the technological line at the SVRŽNO quarry
COLAS CZ a.s., Prague, Lomy Jihlava plant
Year of realization: 2018
Heap with tunnel collection at the VÍCENICE quarry
COLAS CZ a.s., Prague, Lomy Jihlava plant
Year of realization: 2018
Conveyor belt transport of stone aggregate at the NASSEREITH quarry, Austria
BMTI – Baumaschinentechnik International GmbH, Trumau, Austria
Year of realization: 2018
Equipment for reduction of the washable 0-4 mm particles proportion in fraction, using dry method in the BOHUČOVICE quarry line
Kamenolomy ČR, s.r.o., Ostrava
Year of realization: 2019
New primary line node at the HUSINÁ quarry, Slovakia
Kameňolomy SR, s.r.o., Zvolen
Year of realization: 2019
Reconstruction of the primary node of the LIBOCHOVANY quarry line
Eurovia Kamenolomy, a.s., Liberec
Year of realization: 2019
Installation of reservoirs at the GORNO EZEROVO quarry, Bulgaria
Andela OOD, Burgas, Bulgaria
Year of realization: 2019
Reconstruction and modernization of the OPATOVICE quarry line
Českomoravský štěrk, a.s., Mokrá
Year of realization: 2019
New primary crushing plant and demining for TL in the KAPLICE quarry
Kamenolomy ČR s.r.o.
Year of realization: 2020
Reconstruction and modernization of the line in the ČÍHANÁ quarry
Kamenolomy ČR s.r.o.
Year of realization: 2020